lepper. just keep f5ing this link: https://www.mturk.com/mturk/previewandaccept?groupId=2QPDNVP3TVONG2D2LUP70EOZF1T03O
So Rubin approved the 50 cent hits I did about 5 minutes ago, yet I am still pending 300 hits from the 30th on?
I wondered that too. Description: A research project to help understand how people perceive different text presentations. The user will be shown a sentence and asked to select the most similar presentation of the sentence using a different text.
I've been saying yes for installation / troubleshooting. All things that help the user set up the product, rather than talk about it's specs.
A PDF that assists the user should be considered a user manual. So, I believe yes. Instruction guide, operating manual, user guide, installation instructions, etc I all mark as Yes.
I accepted a instructor hit and the class is available for spring term and not winter term. Should I leave it blank? Or put in N/A?
That amazing feeling when you get 400 hits from Lepper to break 1,000, and then begin working on the pdf HITs that require 1000+ approved hits